Name: |
Dromoland Castle Hotel & Country Estate, Newmarket, Ireland |
Website: | http://www.dromoland.ie/golf.html |
Contract Type: |
Traditional IEI contract |
Client: |
Dromoland Castle Golf & Country Club |
Company Involvement: |
Dromoland Castle Hotel & Country Estate in conjunction with Turfgrass Consultants awarded EGS the contract in 2002. EGS were the main contractors for the project. The golf course Architect was Ron Kirby.
Start / End Date: |
May 2002 – April 2004 |
Project Description: |
|
The development consisted of a complete remodel of the existing 18 hole course, extending the course into new areas of the Estate. The project was in 2 phases - consisting of 9 holes in each phase. It included the construction of new greens, tees, bunkers and some fairway areas with the installation of a new extensive drainage system and top dressing programme.
Full fairway & semi-rough drainage system consisting of main drain network between 100-160mm diameter with 80mm lateral pipes at 8-10m spacings. Secondary drainage system of 300 mm depth gravel slits at 1-11-2m spacing.