Drainage project - Dromoland Castle Golf Academy Newmarket, Ireland
View project Dromoland Castle Golf Academy Newmarket, Ireland
Full fairway & semi-rough drainage system consisting of main drain network between 100-160mm diameter with 80mm lateral pipes at 8 to 10 metre spacings. Secondary drainage system of 300mm depth gravel slits at 1 metre spacing
Name:                                    

Dromoland Castle Golf Academy Newmarket, Ireland

Website:                               http://www.dromoland.ie/golf.html
Contract Type:                    

Traditional IEI Contract

Client:                                    

Dromoland Castle Golf & Country Estate

Company Involvement:

 

Dromoland Castle Hotel & Country Estate awarded EGS the contract in 2005.  EGS were the main contractors for the project.  Ron Kirby was the Architect for the project.

Start / End Date:                

September 2005 – April 2006

                  

 

Project Description:

 
  • Excavation 30,000m3
  • Top soil strip of 60,000m2
  • Drainage of 6.8km
  • Secondary slit drainage system of 40,000km
  • Shaping, cultivation and seeding of 48,000m2
  • Construction of 1800m2 of tee surface
  • Construction of 1200m2 of green surface
  • Construction of 6m road 320lm, including ducting and services

The works included a diversion of 400m three phase supply, construction of two greens and chipping area. 

The ground works included the construction of a driving range facility with state of the art up-lighting system through the range area, the construction of 150lm of road with tarmac finish, the construction of a stone gated entrance, landscaping of 1800m2, the cultivation and seeding of the range facility, the installation of main drainage and secondary slip drainage system to the driving range. Design and insulation of greens and tees irrigation system.